TYPE OF FOUNDATION AND STRUCTURE
RCC Framed Structure with RCC Columns @ regular intervals with isolated footings.
All the columns will be interlinked by Plinth beam.
Size of beam and column considered as per Structural Drawing
- Earth work excavation & column as per structural Drawing for the designing of Stilt, First floor, Second Floor and Third Floor, etc.
- ARS, Suryadev, Pulkit or equivalent steel will be used for structure.
- Cement will be used for Ramco, Birla, Penna, Bharathi or equivalent.
ROOF HEIGHT
10’0” for Ground floor, First Floor, Second Floor & Third Floor including slab thickness for 8’6” head room height including slab thickness normally roof thickness will be 4.5” to 5”
SUPER STRUCTURE
External walls will be non-load bearing 8” Solid block/ Brick Masonry with CM 1:6 & Internal walls will be non-load bearing 4” Solid block masonry walls with CM 1:4 with 2 nos of steel strips at every 3’0” interval (where necessary)
ROOF TREATMENT
Terrace floor weathering course will be used pressed clay tile finish.
LOFT
RCC loft of 1.5” thick with necessary bearing on one side in bed room and kitchen, hall with be no loft & cupboard, wood work will be extra cost.
ELECTRICAL
Concealed three phase electricity supply with FRLS wiring with Anchor Roma/Litaski or equivalent Modular switches will be used.
- Light point - 1 sq mm
- Power point - 15 amps & 5 amps
- A/c point - 4 sq mm
- Geyser - 2.5 sq mm
Inverter wiring included 1 Fan, 1 Light, 1 Socket for Living, Bed Room, Kitchen & 1 Socket for toilet.
KITCHEN
- RCC or Cuddapah Slab will be 12’0” length with Black Galaxy granite top. will be laid
- 24” x 18”SS Sink with or without drain board will be provided
- Above platform 4’0” height tiles will be laid
JOINERY
Main Door
Frame: 5” x 3” Medium Quality Burma Teak wood
Door: OST door including brass hardware. will be provided with polish finish with Godrej lock.
Internal Door
Frame: 4” x 2.5” 2nd quality teak wood
Door: Solid PVC Door. Water proofing flushing door
Windows:
UPVC Window frames and shutters with 4 mm clear glass, safety grills at 1.5 to 1.7 kg/Sq. Ft. will be provided.
FLOORING
Entire flat will have 2’ x 2’ Vitrified tiles flooring of basic colors. will be laid. Balcony and passage flooring anti-skid tiles
TOILET
Walls will be upto ceiling hight with coloured glazes tiles up to ceiling height 10” x 13” (Kajaria/ Johnson) approved design for all toilet wall, toilet floor will be finished 1’ x 1’ ceramic anti-skid tiles. (fittings shall be one washbasin, closet, shower with arm, 2 in 1 wall mixer other than this are extra)
PAINTING
Interior: 1 coat of water base primer finished with 1 coat putty, 2 coat of premium emulsion paint will be used
Exterior and Ceiling: 1 coat of white cement finishes with 2 coats of Ace emulsion.
PARAPET
Parapet wall will be 3’6” height with 4.5” wall with both side plastering necessary rings will be provided in terrace.
HEAD ROOM
Head room will be 8’6”, height 9” outer wall with 4” thick roof will be laid terrace door grill safety gate will be provided.
COMMON AMENITIES:
- Covered car park Facial Covered ( earmarked )
- Lift (Automatic) Johnson or equivalent
- Automatic on off switch for bore, sump motor
- CCTV provisions for ground floor area (wiring + camera will be given)r
- Hand pump, taps (Car parking, terrace floor)
- Vastu Compliance
- Highest UDS
- Video door Phone at common lobby e